Oxec
Location:
Santa María Cahabón
Start of operations:
November 2015
Installed capacity:
26,1 MW
Annual energy:
98.357 MWh
Oxec II
Location:
Santa María Cahabón
Start of operations:
August 2018
Installed capacity:
60,0 MW
Annual energy:
259.982 MWh