Hydroelectric Plants

Oxec

Location:
Santa María Cahabón

Start of operations:
November 2015

Installed capacity:
26,1 MW

Annual energy:
98.357 MWh

Oxec II

Location:
Santa María Cahabón

Start of operations:
August 2018

Installed capacity:
60,0 MW

Annual energy:
259.982 MWh